Dry Bulk Terminal
Dry Bulk Terminal
Location
Tuna, Kandla Port, Gujarat   
Project
Dry Bulk Cargo handling facilities for commercial cargo 
Client
Adani Kandla Bulk Terminal Private Limited 
Project Capacity
14 Million Tonnes p.a.
PMC Project’s Role in the project
Planning & Engineering, Survey, Investigations , Support to client in Estimation and Commercial activities, Project management, Site supervision, Quality Control, Management Information System. Audits and Commissioning
Project Scope
  • Four berth consists of 600 m x 60 m berthing structure to handle 2 vessels of 1,00,000 DWT in-front of jetty head and 2 vessels each of 75,000 DWT  in rear side of jetty
  • Approx. 10 kms of conveyor network  : high speed conveying system with 3200 TPH for each stream runs at speed of 8 m/s
  •  4 mobile harbour cranes , & 4 mobile hoppers
  • 80 Ha of back yard area for stacking of Cargo
  • Storage godown for 1,00,000 MT cargo
  • Mechanized bagging units
Project Status
Under development
Benchmark parameters
Terminal construction including Marine and backup yard is likely to be completed in 24 months, which will be fastest in India. Conveyor of 8.1m/sec speed is being designed and developed for first time in India
Location
Dahej, Gujarat
Project
Dry Bulk Cargo handling facilities for commercial cargo  
Client
Adani Petronet (Dahej) Port Pvt. Ltd. (APPPL)
Project Capacity
20 Million Tonnes p.a
PMC Project’s Role in the project
Planning & Engineering, Survey, Investigations , Support to client in Estimation and Commercial activities, Project management, Site supervision, Quality Control, Management Information System. Audits and Commissioning
Project Scope
  • Planning & Engineering, Survey, Investigations , Support to client in Estimation and Commercial activities, Project Two berths design to handle Panamax vessels (80,000 DWT)
  • Berth is connected to backup yard with 2.4 km long approach bund.
  • Top side jetty equipment’s are mobile harbour cranes, mobile hoppers with conveying system 4200 TPH rated capacity.
  • Stacker / reclaimer - 2 nos : stacking capacity 4,200 TPH (rated) & reclaiming capacity 2,500 TPH (rated)
  • Port conveyor system (length of conveyor approx. 5.5Km) : stacking stream@ 4200 TPH at 4.2 m/s  & reclaiming stream @ 2,500 TPH at 4.2 m/s
  • Port to silo conveyor (length of conveyor approx. 3.5 Km)  Capacity - 5000 TPH and speed 7.5 m/s
  • Silo capacity for coal 4000 tons
  • Railway system
  • Utilities such as fire fighting & portable fire extinguishers system, dust suppression system, utility & O&M buildings,
  • Services such as water, power, control system communication and security.
  • Truck loading arrangements
  • Site supervision, Quality Control, Management Information System. Audits and Commissioning
Project Status
Under development
Benchmark parameters
India's First elevated Triangular  gallery for Overland high speed Conveyor System was commissioned at Dahej project