Multipurpose Terminal
Multipurpose Terminal
Location
Mundra Gujarat, India
Project
Three Multipurpose Port Terminals for various Dry, Liquid and Break bulk cargo
Client
Adani Port and SEZ Limited
Project Capacity
30  Million Tonnes p.a.
PMC Project’s Role in the project
Planning & Engineering, Survey, Investigations , Support to client in Estimation and Commercial activities, Project management, Site supervision, Quality Control, Management Information System. Audits and Commissioning
Project Scope
  • Three terminals ( Twelve Number of Berths designed to handle vessels having max draft of 15.5 m )
  • 16 Nos of mobile harbour cranes
  • 2 rail-mounted mobile hoppers for direct discharge to import conveyors.
  • 10 mobile hoppers for direct discharge into dumpers.
  • 3.6 km conveyor system capable of handling 1,500 TPH of import as well as export cargo.
  • 1 of 1000 TPH ship loader.
  • 40 nos. excavators & 50 nos. loaders including 8 nos. CAT loaders.
  • 60 nos. 40 ft. trailers for internal transportation.
  • 225,000 sq. metres of closed godowns and 3,150,000 sq. metres of open storage yards for storage of cargo within the port premises.
  • Dedicated Storage area for various steel and project cargo
  • Mobile Equipments in backup yard
  • Liquid tank-farm
  • Supporting utilities and backup infrastructure
  • Road and Railway Infrastructure
Project Status
  • All terminals are operationals
  • Use of precast pre-stressed concrete spun piles for the first time in India
  • Twin Berthing facilities in record time
  • From planning to handover,  300 metre length of berth 9 was completed in 7 months

Location
Hazira, Gujarat, India  
Project
Multipurpose Port infrastructure development for commercial cargo
Client
Adani Port and SEZ Limited
Project Capacity
32  Million Tonnes p.a.
PMC Project’s Role in the project
Planning & Engineering, Survey, Investigations , Support to client in Estimation and Commercial activities, Project management, Site supervision, Quality Control, Management Information System. Audits and Commissioning
Project Scope
  • 5 berths (2 container & 3 multipurpose) – deep draft berths capable of handling Panamax vessels.
  • Length of approach channel is 1200 meters & turning circle is 600 meters
  • 4 tugs with a total towing power of 250 tons
  • Capital Dredging : approx. 8 mm³
  • Container terminal – 20 ha approx.
  • Large backup areas of covered godowns, open hard standings with specialized equipment.
  • Excellent road to the hinterland
  • Approx. 14 km lane of internal road
  • 130000 sq. mtrs of well demarcated open storage yard for minerals, project cargo, scrap, clinker, etc.
  • 250m x 45m closed godown for storage of various cargoes viz. fertilizers, fertilizer raw materials (FRM), DOC, wheat, rice, sugar, etc.